Mailbox | OA | 中文简体

History

2016

Completed material assets reorganization with Zhongshan Broad-Ocean Motor Co.,Ltd.

2015

The second phrase construction of Jiading plant completed.

2014

The first phase construction of Jiading plant completed, and company moved into Jiading plant.

2013

Became the cooperation base of talent training and university-industry cooperation with Tongji university.

2012

Changed into joint-stock enterprise.

2012

Operated the “Shanghai Engineering Research Center of Electric Drive System of Vehicle” which cooperates with Shanghai Auto Test Center.

2012

Laid the cornerstone for the new plant in Jiading.

2011

The new lab was built and came into use.

2011

New plant in Minhang district was completed, and new production line was put into practice.

2011

Established Industry Technology Innovation Strategic Alliance of Electric Drive System of Vehicle.

2011

Passed the project of Shanghai Engineering Research Center of Electric Drive System of Vehicle.

2010

Passed TS16949 certification.

2009

Laid the cornerstone for the new plant in Minhang.

2009

The first automotive electrical system for the flexible production line which has 12000 sets capacity.